View work packages

Tap Work Packages at the bottom of the screen to view your work packages.

Open a work package

Tap on a work package name to open the work package:

Color code

What it means

The work package is new and unread.

You already read the work package, however new changes were made to it.

You already read the work package or marked it as read. If you mark the work package as unread, then it will turn back to the previous color.

To mark a work package as read or unread:

  • Slide the work package to the left and select the appropriate action.

  • In the work package Overview section, tap Options and select the appropriate action.

Find a work package

  1. Tap the Filter on the top right corner.

  2. Choose one or more of the following options based on the information you have:

    • Status: Only work packages with the status you choose, appear in the list.

    • Dates: Choose from the following options:

      • Planned: Select the date ranges for the Planned Start Date and Planned End Date.

      • Created/Edited: Select the date ranges for the Created and Edited dates.

    • Discipline: Select the required discipline.

    • Purpose: Select one or more categories of purposes.

    • WBS: Select the work breakdown structure from where you want to filter the work packages.

  3. Tap ICON_left arrow(Chevron) to go back to the work packages screen.

Sort work packages

  1. Tap Sort on the top right corner.

  2. Choose from the following options under Sort by:

    • New/Modified: Select to sort the work packages depending on their status in the following order: new, modified, and read.

      All the new work packages are ordered first followed by the modified and read work packages.

    • Planned Start Date: Select to sort the work packages based on their planned start dates.

    • ID: Select to sort the work packages based on their IDs.

  3. Select an option under Arrange by to order the work packages either in ascending or descending order.

SHARED Tip Tap ICON_left arrow(Chevron) to go back to the work packages screen.

Add progress to a work package

  1. Choose the required work package.

  2. Swipe left and tap the Update Progress card.

  3. Drag the % slider or enter the installed quantity to mark the progress of work package or a work step.

  4. Tap UPDATE.

  • You can also tap the required work package or work step and then tap UPDATE PROGRESS from the respective Overview screens.

  • If you are progressing your work package or work step for the first time, tap START PROGRESS and select the actual start date and then mark the progress.

  • You can update the actual end date and time only when the work package progress is set to 100%.

View resources for a work step

  1. Open a work package.

  2. Tap the Work Steps tab.

    You can see the list of work steps.

  3. Tap the required work step.

  4. Tap the Resources tab.

  5. Tap the required resource category to see the list of resources in it.

Open a model related to work package and navigate

  1. Tap on a work package name to open the work package.

  2. Tap the 3D Model tab to view a model.

  • In the Android application, pinch two fingers together, and then spread them apart to zoom into the document, drawing, or a model. Pinch your fingers back together to zoom out.

  • In Android and iOS application, drag your finger on the screen to explore different parts of the document, drawing, or model.