With the MS Project XML import, the Tasks are converted into work packages.
The requirements are the same as those described in the previous section (Retrieve a P6 EPPM schedule via API integration).
Example of MS Project Schedule.
With the MS Project XML import, the Tasks are converted into work packages.
The requirements are the same as those described in the previous section (Retrieve a P6 EPPM schedule via API integration).
Example of MS Project Schedule.