When you create a scheduler task to synchronize tags to FLOCs, the scheduler runs a query based on the specified time and frequency and retrieves the detail related to the task. If the detail is created for tag synchronization, it checks the report and selects the respective tags from the report for synchronization.
Ensure the following before creating a scheduler task:
-
The Main Scheduler and Sync Scheduler are started.
-
A detail object is created, and all mandatory objects are related to it.
-
In the Connectors feature set, select Create Sync Scheduler Task.
-
In the Name box, enter the name for the scheduler task.
You can enter a description in the Description box.
-
In the Date Time calendar, select the date and time for synchronization.
-
In the Sync Frequency list, select how often you want the task to run.
-
In the Sync Detail list, select a detail object for synchronization.
-
A detail object can be related to only one scheduler task.
-
For more information about schedulers, see Configuring schedulers.
-
The procedure to create a delete sync scheduler task is the same as the procedure for creating a sync scheduler task.