SG-4156 Generate WOs | Preview | Generate - Unable to generate WO for specific PM Schedule |
Description |
|
Customer has a PM TO2588 which has 4 activities with task plans. Each of these task plans have checklist items of 70 to 200 over items and in Equipment tab, there is route selected which consist of 29 equipment. When click on Generate, the system will become unresponsive and terminates after a while. Steps : # Go to Routes and create a new route W20TOD05. # Go to Assets and create new equipment (total 29 equipment) # Go to Routes and retrieve route W20TOD05. In Equipment tab, add the 29 equipment created in step 2. # Create 4 Task Plans CSS 052A, CSS 052B, CSS 053C, CSS052D. In checklist tab, add 70 to 280 lines for each task with the following equipment level = Route and Equipment, Type = Checklist Item, Required Entry = NO. Go back to record view to enable Active Checklist. # Go to PM Schedules and create a new PM TO2588. Type = Fixed, Perform Every 2 Years. In activities tab, create 4 lines and select Task Plans CSS 052A to CSS 052D. In equipment tab, select route = W20TOD05, equipment = TOW20444B, due date = 31 Dec 2022, organization = UGL. # Go to Generate WOs. In Parameters tab, Generate Through = 01 Jan 2023, Organization = UGL, PM = TO2588, Release WOs for Fixed/Variation PMs is enabled. Click on Process. # In Preview tab, select the record for PM = TO2588 and click on Generate. ˜Page Unresponsive will appear a few times, click on ‘Wait’ for each time, and then WO is not generated after a long time. Actual Results : Unable to generate WO for specific PM Schedule Expected Results : To be able to generate WO |