SG-3151 Work Orders | Checklist - Entering meter reading with same value as last meter reading returns error. |
|
Description |
|
Steps to reproduce # Create an equipment record. # Add logical meter to the equipment. # Enter meter reading of 50.6. # Create task checklist with meter reading function (make sure to check the active checklist box on the task header). # Create a work order. # Add activity with the task created. # Populate meter reading on WO checklist with 50.6 (same value as current reading). # Save. Actual result Value cannot be less than last reading. Expected result System saves the meter reading and create a new record in r5readings with new date but same meter value. |