SG-1565 Work Orders - Last Meter Reading does not update to the correct value if equipment is linked to 2 meters with different UOM - HxGN EAM - Version 12.0 - Hexagon

HxGN EAM Resolved Issues for 2022

Language
English
Product
HxGN EAM
Search by Category
HxGN EAM Version
12

SG-1565 Work Orders - Last Meter Reading does not update to the correct value if equipment is linked to 2 meters with different UOM

 Description 

The PMLSTMTR is giving wrong last read value to my close PPM work order. I have assets that runs on multiple meters, for the PMLSTMTR to work, the OBJ_PRIMARYUOM need to be populated. I have PM and MP programs that runs on these meters.

When release, the EVT_FAILUREUSAGE = LAST METER READ of the corresponding PM and MP meter UOMs. On completion, the EVT_FAILUREUSAGE = LAST_METER_READ of OBJ_PRIMARYUOM.

Steps:

# Go to Asset ‘220608-EQN1’ record view, Meter Unit = ‘km’.

# In Meters tab, create lines for Physical Meter = KM. (UOM = ‘km’) and Physical Meter = H. (UOM = ‘HUR’)

# Go to Organizations, Organization = SG-OFF, in Options tab, filter for ‘PMLSTMTR’ and set to 'NEW'.

# Create 2 PM Schedules, fixed type :

## PM ‘220608-PM-KM.’ Meter Interval = 1000 km. In Equipment tab, add equipment ‘220608-EQN1’ and set Meter Due as 1000

## PM ‘220608-PM-H.’ Meter Interval = 250 HUR. In Equipment tab, add equipment ‘220608-EQN1’ and set Meter Due as 250

# To release the 2 PM Schedules, go to Assets and retrieve ‘220608-EQN1’, in Meter Readings tab, enter lines for :

## UOM = ‘Kilometers’, Value = ‘1001’

## UOM = ‘'Hour’, Value = ‘255’

# Go to Work Orders and retrieve for equipment = ‘220608-EQN1' which will display the released PM WOs, notice that Last Meter Reading would correspond to the last read of the PM UOM.

# Change the status of the Work Orders from ‘Released’ to ‘Completed’ and the Last Meter Reading would change to last read of Asset ‘Meter Unit’ UOM values.

Expected result: ‘220608-PM-KM.’ WO Last Meter Reading = last read of KM. ; ‘220608-PM-H.’ WO Last Meter Reading = last read of H.

Actual result: When PM work order is close, Last Meter Reading is updated to the last reading of Asset ‘Meter Unit’ UOM values regardless if ppm_metuom/mtp_metuom is not the same as obj_primaryuom.