Replacing meters - HxGN EAM - 12.0.1 - Mobile

HxGN EAM Mobile User

Language
English
Product
HxGN EAM
Search by Category
Mobile
HxGN EAM Version
12.0.1

Replace physical meters on equipment as necessary.

If you take action upon equipment identified as a Safety piece of equipment, the system shows a confirmation message asking whether you wish to continue.

  1. Select Equip > Meter Replacement.

    The Equip lookup shows all equipment records that have meters attached and that are in the organizations for which you have access permission.

  2. Specify this information:

    Equip - Specify the equipment for which to replace meters.

    Meter - Specify the meter to replace.

    New - Specify the new meter.

  3. Click Save.

  4. Click Yes.

    You should synchronize your handheld data after replacing meters and before entering meter readings for replaced meters.