Breaking down linear PM work orders - HxGN EAM - Version 11.07.01 - Feature Briefs - Hexagon

HxGN EAM Linear Equipment

Language
English
Product
HxGN EAM
Search by Category
Feature Briefs
HxGN EAM Version
11.7.1

You can use the Breakdown Linear Work tab on the PM Schedule screen if you need to inspect linear equipment with a certain frequency but because of the length of the equipment it is not practical to do all the work on the same work order. On this tab you can breakdown the linear work order in smaller sections that can be handled by a single work order. For this function to work you must first associate the equipment to the PM schedule on the Equipment tab of the PM Schedule screen. You must create one entry for the equipment and fill in all the details you would normally fill in on this tab. Because it is linear equipment, make sure you enter the From Point and the To Point. Next, go to the Breakdown Linear Work tab where you can select this equipment and break the work down into smaller sections. When you click save, the system will generate records on the Equipment tab based on the sections specified.