Entering meter readings for logical meters - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

To enter meter readings for logical meters:

  1. Select one of these options:.

    • Equipment > Assets

    • Equipment > Positions

    • Equipment > Systems

    • Equipment > Setup > Locations

  2. Select the equipment for which to enter meter readings, and then click the Meters tab.

  3. Select the meter for which to enter a reading, and then click Enter Meter Reading.

    You can enter a reading for a date that is earlier than the last reading date. The value for the new reading must be between the prior and subsequent readings. For example, if there are previous readings for August and October, you can enter a new reading for September. If the reading in August was 100 and the reading in October was 200, then the reading entered for September must be between 100 and 200.

  4. Specify this information:

    Entry Type - Choose one of the entry types:

    Option

    Description

    Reading

    Specify the current meter reading for Value.

    Difference

    Specify the difference between the last reading and the current reading for Value.

    Date/Time

    Specify the date and time of the meter reading.

    Value

    Specify the meter reading value.

    Date/Time - Specify the date and time for the meter reading.

    New Value - Specify the new value for the meter reading.

    Work Order - Specify the work order. The system automatically populates Related Work Order if a related work order exists.

  5. Click Submit.