This procedure allows you to establish the time-phased settings manually in the Original Budget Time-Phasing panel.

  1. Click the Time-Phasing tab.

  2. Click the Time-Phasing Method ellipsis and select the required time-phasing method. The available time-phasing curves are listed below:

    • Back Loaded

    • Bell Curve

    • Detail Settings

    • Front Loaded

    • Linear

    • Manual

    • Project Schedule

      By default, the Time-Phasing Method for Contingency line item Type is selected as Detail Settings. This attribute is non-editable and is highlighted in grey color.

  3. Select the required Start Date and End Date.

  4. Click SAVE.