View or Update Estimate Structure General Attributes - EcoSys - 3.02 - Help - Hexagon PPM

EcoSys Projects Help (3.02)

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Standard Version
3.02

Follow the procedure below to update the project structure attributes.

  1. In the Estimate Structure Details panel, click the General tab.

  2. Edit the Object Name, if required.

  3. Click the ellipsis and select the required values:

    • Type - Select a project type.

    • (Optional) Responsible Manager - Select a responsible manager.

  4. (Optional) Type in the required Objective.

  5. Click SAVE.