-
Stop the service
-
Delete the following files from the \modules\com\primavera\main folder:
-
intgserver-wrapper.jar
-
module.xml
-
-
From the EcoSys installation media, unzip the \EcoSys\alt\deploy\esfm-jboss-overlay-<db>.zip file to the \modules\com\primavera\main folder.
-
Copy all of the Primavera API .jar files from the P6 Integration API \lib directory to the \modules\com\primavera\main folder.
-
Start the service.
-
Skip to the section Testing the P6 API within EcoSys.
For P6 18.8 use the files from the P6 17.12 templates folder.