This procedure allows you to update the general project structure attributes only if the Cost Control Level for the project structure is assigned.
If the Cost Control Level for a selected project structure is blank, then the project structure attributes can only be viewed but not modified.
-
In the Project Structure Details panel, click the General tab.
-
Edit the Object ID, if required.
-
Edit the Object Name, if required.
-
(Optional) Type in the number of Balance Periods.
-
(Optional) Type in the number of Adjustment Periods.
-
(Optional) Type in the required Objective.
-
Click the ellipsis and select the required values:
-
Type: Select the project type.
-
(Optional) Responsible Manager: Select the responsible manager.
-
Progress Method: Select the progress method.
-
Forecast Method: Select the forecast method.
-
(Optional) Forecast Balance Method: Select the forecast balance method.
-
(Optional) Forecast Adjustment Method: Select the forecast adjustment method.
-
(Optional) PMB: Select Yes.
-
(Optional) OBS Name: Select the OBS name.
-
(Optional) CBS Name: Select the CBS name.
-
(Optional) ABS Name: Select the ABS name.
-
(Optional) ICMS Cost Categories and Groups: Select the ICMS cost categories and groups.
-
-
Click SAVE.