Update Project Equipment Rates - EcoSys - 2.03 - Help - Hexagon PPM

EcoSys Help - Projects (2.03)

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Standard Version
2.03

This procedure allows you to update the project equipment rates.

  1. Click the Rates Tables tab.

  2. In the Rates panel, click the Update Project Equipment Rates.

  3. Click the Insert Row icon to add a new labor rate.

  4. Click the Equipment ID ellipsis to select the required equipment.

  5. Click the Currency ellipsis to select the required currency.

  6. Click the Transaction Category: Region ellipsis to select the required region.

  7. Type the required Rate: Base.

  8. Click the Save button. The Equipment Name auto-populates based on the Equipment ID selected.

    Click the Delete Row(s) icon to delete the equipment rate.