Establish Manual ETC Amount - EcoSys - 4.11 - Help - Hexagon

EcoSys Contracts Help (4.11)

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Standard Version
4.11

This procedure allows you to update the Manual ETC amount manually for contract lines with a Manual EAC forecasting method.

  1. Navigate to Forecasts > Contract Forecast.

  2. At the top of the screen, in the green parameter bar, click the Contract ellipsis to select the required contract.

  3. Click Refresh for screen update.

  4. Click the Contract Forecast tab.

  5. Type the Manual ETC for the cost control objects with Manual ETC forecast method.

  6. Click SAVE..