Import Contract Progress allows for the assignment of Progress Methods. In addition, Physical % Complete can be established at applicable Contract Cost Control Levels.

This procedure allows you to import new or update Progress Methods and or Physical % Complete.

  1. From the Sheet menu, select Import.

  2. In the Import Spreadsheet dialog box, click Browse to identify and select your file.

  3. Select the desired Format, matching your selected file.

  4. Select the Import rule for Incoming Records of Create New/Update Existing.

  5. Select Preview data before saving to allow the user to validate records prior to save.

  6. Click OK to import the file.

  7. Review the data on screen to verify that it matches the import file.

    If rows are missing or field values are blank, do not proceed. Click REFRESH on the spreadsheet to purge the data, revisit the import file to correct errors and repeat the above procedure.

  8. Click SAVE to store the changes.

  • You can customize the view of the Import Contract Progress panel from the view settings.

  • Progress Method IDs must be used rather than the Progress Method Names displayed in the VOWD tab.