This Release Bulletin provides a brief description of any enhancements or new features as well as bug fixes that are included in version 2024.1.
Rollout schedule
-
This version is only available in Hexagon Smart Cloud.
-
It has been rolled out to the ‘preview’ ring on September 21-22, 2024
-
It is rolled out to the ‘production’ ring on Oct 19-20, 2024
-
Use the ‘preview’ ring to test your configuration before this version rolls out to ‘production’
What's New
Time zone support in the job scheduler
In prior versions of Connect, schedules were implicitly created in the time zone that the Connect cluster was configured to use. Starting with this version, the time zone can be explicitly configured.
What's Changed
Job Name Length During Migration
-
When migrating from Connect 3.1 to this release, job names greater than 57 characters will be truncated to their first 57 characters suffixed with “-nn” where n is 0-9
-
If multiple jobs have the same first 57 characters, the suffix is designed to make every job name unique
-
Connect Actions configured in EcoSys that reference such jobs will need to be edited with the new name
What's Fixed
EcoSys ID |
Key |
Summary |
25179 |
Fixes an issue in the UI where a progress indicator is not shown when a job ‘save’ operation takes longer than expected |
EcoSys Version
This release requires EcoSys version >= 9.3.01
Variables
No new variables have been introduced in this release.