Alix simplifies Estimate Summary by enabling users to analyze estimate cost data, track cost trends over time, and manage estimate snapshots effectively.
-
Ability to request cost data for an Estimate Project at both the summary level (upper spreadsheet) and detail level (using the Summary tab)
-
Ability to request cost data over time through time-phased details
-
Ability to time phase an Estimate Project for accurate cost distribution
-
Ability to snapshot an Estimate Project to capture and preserve estimate data at a specific point in time
To use Alix, select on the tool bar.
Refer to EcoSys Alix Help for guidance.
Example Prompt: What is the time phased cost in Period X for Estimate Project X?
-
In the Message Alix box, enter What is the time phased cost in Feb 2026 for Estimate Project-PRJ-000031 - MCP Doc?
-
After you enter the question, Alix displays the time-phased cost for the requested period.
-
You can view the cost in the Time-Phasing tab for the requested period.
When writing the prompt, specify ‘Estimate Project X’ rather than only ‘Project X'.