The software automatically adjusts tags on lines when you move a line.
-
Start a new drawing with a database.
Draw a major primary line in model space.
-
Click Setup on the Process Lines panel.
-
Select System On (Dynamic Size/Spec).
-
Add categories and separators as needed.
-
Select a category, and then assign a value in the Default value box.
-
Click OK.
-
Click Tag Line .
-
Select the major primary line.
The software places the primary tag.
-
Select the major primary line, and then click the middle grip point.
-
Drag the line up.
The software moves the tag with the line.