It is also possible to define revision schemes for specific plants or projects. For example, you might need different revision schemes in Plant A and Plant B.
-
Create a revision scheme.
-
Relate it to the relevant plant, so that it is used in preference to a default scheme configured at Configuration Top.
The same options are available for using the next major revision on merge as previously described.
You can split revision schemes up by configuration, so that only some are available by configuration level or by specific document. For more information, see Revision schemes configuration.