Create a new load job - HxGN SDx - Update 63 - Administration & Configuration

Administration and Configuration of HxGN SDx

Language
English
Product
HxGN SDx
Search by Category
Administration & Configuration
SmartPlant Foundation / SDx Version
10

You can create a load job in the Web Client. When setting up a plant or project, you can control the type of data entering your system and validate it by converting the SDx object into a load job. The load job contains one or more control files with all the details of the data that must be validated before entering into the system, like tags or documents and their file attachments. Each load job has a defined classification that determines which type of data must be validated using Data Validator.

If you upload more than one control file while creating a load job, the control files are automatically associated with the respective import definitions by the system.

When a load job file is uploaded, the attached files are transferred to a specified location where the files can be scanned for viruses before being loaded into Data Validator. Data Validator validates the quality of the incoming data in the supplied files before they are loaded into the system.